Jump to content

Recommended Posts

Posted (edited)

This Modi govt is  over estimating the engineering capabilities of HAL and DRDO. Time for them to see the reality and switch to high precision weapons like aircraft to be procured from foreign firms.

 

Small stuff like guns and drones can be made by our people. But not aircraft. Multiple hurdles to be crossed.

Edited by kepler37b
Posted
23 minutes ago, kepler37b said:

The question is: does HAL have man power and organizational culture to understand and manufacture these designs?

Ever heard of GTRE?

Posted (edited)
1 hour ago, kepler37b said:

That is DRDO. I am speaking of HAL. Also, where is the Kaveri engine?

GTRE is the one working on Kaveri as well.

HAL's responsibility is to validate the thrust and do the assembly into the aircraft shell...which they can do.

 

HAL Koraput has been producing/assembling the AL31 engines...while it has more than 50% of indigenous products...Russia still has control on the key components.

 

Kaveri with afterburner is still short of required thrust needed to power Tejas...hence its w/o afterburner engine will be used for UCAVs

Edited by singhvivek141
Posted
3 hours ago, kepler37b said:

That is DRDO. I am speaking of HAL. Also, where is the Kaveri engine?

Kaveri engine development program needed funds in the range which it never got still they have developed an engine with 73kN with AB,

Not feasible with current Tejas requirement which has reasonable power thirsty avionics

Kaveri dry with 49.2kN is chosen for Ghatak 

 

Posted

Sandeep & Gen PR Shankar talks here about how Asim Kothewali was planning for a "N" strike against India, when we blasted their Kirana Hills Nuclear Storage Facility.

 

 

 

×
×
  • Create New...