Jump to content

Recommended Posts

Posted

Probably not the right time to say this but the builder & BMC co-conspirators should be hanged - this isn't just negligence, it should be classified as criminal intent to harm (others) :wp35:

Posted
3 hours ago, coffee_rules said:

some rumors on twitter. TOI says 6 now. BMC/State government has to own up, third in 2 years in Mumbai. 

Contractors who built the bridge should be fined, sued by victims.  

Posted (edited)

BMC and the railways passing the buck on to each other. An "independent" auditor okayed this bridge in Sep 2018. Tells you about the level of deep rooted systemic rot.

 

BMC has ruined Mumbai. The only elections that really matter to the people of Mumbai are the BMC elections and the last time the BJP came very close to wresting control from the SS. Anyone but SS for the BMC, who have destroyed this beautiful city in their 25+ year tenure.

 

Edited by Mariyam
Posted
2 hours ago, chewy said:

Shitty Indian engineering quality and standards

Lack of quality control is pathetic in every walk of Indian life

 

quality and standards are low because contractors wants to milk as much money as possible ..

Posted
4 hours ago, velu said:

 

quality and standards are low because contractors wants to milk as much money as possible ..

True, but also incomptency from government inspection bodies and third party inspectors/surveyors (who are corrupt and easily bribed).

 

You've have thousands of small contractors and manufacturers claiming to.be ISO 9001 Quality Management Systems and everybody knows in India these are easily.obtainable by paying small bribes to so called certification bodies and their agents in India

 

Big Foreign companies/buyers don't trust certification of Indian manufacturing companies unless certified by credible agencies (mainly based in developed countries)

 

That's why the Made In India campaign is so hollow, no one is held accountable for adhering to quality standards. And majority of Indian consumers are too stupid to realise the rubbish quality they are buying as long as it's cheap

Posted
13 hours ago, Straight Drive said:

And probably the officials are asking the share of profits as well from contractors.

At least 30-40% goes as bribes.  Contractors are stuck between corruption at every step and are hardly making anything.  Expecting quality when you have to pay 40% bribes is insane.

Posted
1 hour ago, R!TTER said:

Probably? You don't get contracts in the city, or villages, without bribing officials, this is after all the old new India :frown:

This is the old India and things have not changed in this aspect.

Posted

An insane level of corruption goes on in BMC.

 

Last monsoon, this happened:  https://www.hindustantimes.com/mumbai-news/loose-soil-triggers-panic-about-another-landslide-near-mumbai-s-wadala-building/story-5x2uTVzolJ6djek2BwrtXJ.html

 

If high society buildings where tiny flats cost crores are at the risk of landslide, one can only expect bridges collapsing & restaurants without fire exits. 

 

There was an assistant engineer for road construction. He got into a dispute with his wife and the filth came out in public. Apparently he's got many flats worth 15 crores & then ran coaching class during office hours: https://mumbaimirror.indiatimes.com/mumbai/cover-story/bmc-engineer-who-ran-coaching-classes-and-owns-nine-flats-in-city-found-guilty/articleshow/61955460.cms

 

There was also one jerk politician who went about modifying the ground floor of his building randomly which led to it's collapse: 

https://www.hindustantimes.com/mumbai-news/ghatkopar-building-collapse-bmc-says-alterations-by-shiv-sena-s-sunil-shitap-to-blame/story-fopPz4n7jKiYdAtqOuD5XM.html

 

 

No wonder the city suffers on a daily basis, glad to have left it & hoping that I never end up moving back.

Posted

This isn't just BMC, it happens in every city or Panchayat level. You can try fighting against it but then you disappear overnight or worse, like what happened to that anti graft activist a few years back.

Posted
8 hours ago, rkt.india said:

At least 30-40% goes as bribes.  Contractors are stuck between corruption at every step and are hardly making anything.  Expecting quality when you have to pay 40% bribes is insane.

What? Contractors are the real corrupt forces who feed the government officials (high level ones) .final money gets sanctioned from the government ministry which is scaled very high during tendering by the respective department ,the estimated amount comes very high (taking into account contractor's profit ,bribes etc ) which is why contractors use low quality inputs.

 the payment happens in phases,

Normally once they get 80-90 percent of the payment they run away with finishing still remaining 

×
×
  • Create New...